Analyzing the Performance of Mega Construction Projects in Oman: A Study of Selected Projects from Oil & Gas Sector

Main Article Content

Ahmed Salim Al Saeedi
Asif Mahbub Karim

Abstract

This study investigates Omani O&G project’s performance and analyzes the most common time and cost overrun causes. In addition, the effects of delays are examined further along with the key enablers for efficient project delivery. This study adopts a mix method of research to improve the level of credibility of the study. A sample of 160 respondents is employed following both quantitative and qualitative method where a well-structured questionnaire was used for interviews with the concerned personnel. Following the quantitative method, this study revealed that 8% of the respondents, says the projects have completed ON time where the response rate was 80%. Besides, the qualitative part backed up this data as most of them have experienced delay of 3 months to 2 years of delay. For cost, 3% of the respondents have experienced projects finishing ON budget and the interviewees have expressed that the average cost overrun is between 10%-30%. In terms of time overrun group factors, the top group time-overrun factors among all the three parties are management factors, where it is ranked first by all stakeholders. The sub-group factor that affects more is the project planning and control. Poor understanding of scope of work during tendering factor is ranked first with main contractor and second with both the client and engineering firms. This factor is most factors that has similar ranking between all. As matter of fact is the only factor that exists between in the top 10 among all stakeholders. This study claimed that understanding the scope of work of the project properly and giving its time to be grasped by the contractors is one of the key solutions to tackle the top factor of this research. Also, the SOW must be detailed as possible to avoid any conflict between the parties, one of the recommended details to have WBS included.

Downloads

Download data is not yet available.

Metrics

Metrics Loading ...

Article Details

How to Cite
Saeedi , A. S. A. ., & Karim , A. M. . (2020). Analyzing the Performance of Mega Construction Projects in Oman: A Study of Selected Projects from Oil & Gas Sector. American International Journal of Business and Management Studies, 2(2), 52–72. https://doi.org/10.46545/aijbms.v2i2.247
Section
Original Articles/Review Articles/Case Reports/Short Communications
Author Biographies

Ahmed Salim Al Saeedi , Binary University of Management and Entrepreneurship, Malaysia 

PhD Research Fellow

Binary University of Management and Entrepreneurship, Malaysia 

 

Asif Mahbub Karim , Binary University of Management and Entrepreneurship, Malaysia 

Dean and Associate Professor

Binary University of Management and Entrepreneurship, Malaysia 

References

Alnuaimi, A.S., & Mohsin, M. (2013). December.Causes of delay in completion of construction projects in Oman.In International Conference on Innovations in Engineering and Technology, 267-270.

Assaf, S. A., & Al-Hejji, S. (2006). Causes of delay in large construction projects. International journal of project management, 24(4), 349-357.

Alamri, N., Amoudi, O., & Njie, G. (2017). Analysis of construction delay causes in dams projects in Oman. European Journal of Business and Social Sciences, 6(2), 19-42.

Alnuaimi, A.S. & Mohsin, M. (2013). December.Causes of delay in completion of construction projects in Oman.In International Conference on Innovations in Engineering and Technology, 267-270.

Alnuaimi, A.S., Taha, R.A., Al Mohsin, M., & Al-Harthi, A.S. (2010). Causes, effects, benefits, and remedies of change orders on public construction projects in Oman. Journal of Construction Engineering and Management, 136(5), 615-622.

Chan, A. P. C., Scott, D., & Chan, A. P. L. (2004). Factors Affecting the Success of a Construction Project. Journal of Construction Engineering and Management, 130(1), 153-155.

Chanmeka, A., Thomas, S. R., Caldas, C. H., & Mulva, S. P. (2012). Arpamart Chanmeka, Assessing Key factors impacting the performance and productivity of oil and gas projects in Alberta. Can.J. Civ.Eng. 39,259-270.

Cooke-Davies, T. (2002). The “real” success factors on projects. International journal of project management, 20(3), 185-190.

De Wit, A. (1988). Measurement of project success. International journal of project management, 6(3), 164-170.

Desai, N., Pitroda, J.A.Y.E.S.H.K.U.M.A.R., & Bhavsar, J. (2015). A review of change order and assessing causes affecting change order in construction. International Academic Research for Multidisciplinary, 2(12), 152-162.

Doloi, H., Sawhney, A., Iyer, K. C., & Rentala, S. (2012). Analysing factors affecting delays in Indian construction projects. International journal of project management, 30(4), 479-489.

Elawi, G.S.A., Algahtany, M., Kashiwagi, D., & Sullivan, K. (2015). Major factors causing construction delays in Mecca. Journal for the Advancement of Performance Information and Value, 7(1), 75-75.

Fallahnejad, M. H. (2013). Delay causes in Iran gas pipeline projects. International Journal of project management, 31(1), 136-146.

Flyvbjerg, B. (2014). What You Should Know About Megaprojects and Why: An Overview. Project Management Journal, 45(2), 6–19.

Frimpong, Y., Oluwoye, J., & Crawford, L. (2003). Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study. International Journal of project management, 21(5), 321-326.

Heerkens, G. R. (2002). Gestión de proyectos (No. 658.404 H459g). Madrid, ES: McGraw-Hill Interamericana.

Hwang, B. G., Zhao, X., & Ng, S. Y. (2013). Identifying the critical factors affecting schedule performance of public housing projects. Habitat International, 38, 214-221.

Ika, L.A. (2009). Project success as a topic in project management journals. Project management journal, 40(4), 6-19.

Jarkas, A.M., & Younes, J. H. (2014). Principle factors contributing to construction delays in the State of Qatar. International Journal of Construction Project Management, 6(1), 39.

Jergeas, G. (2008). Analysis of the front-end loading of Alberta mega oil sand projects.. Project Management Journal, 39(4),95-104.

Kalkani, K., & Malek, S. (2016). Analyzing causes of delay in construction projects. International Journal for Innovative Research in Science and Technology, 2(12), 136-41.

Le-Hoai, L., Lee, Y. D., & Lee, J. Y. (2008). Delay and cost Overrun in Vietnam large construction projects: A comparison with other selected countries. KSCE Journal Of civil Engineering,12(6), 367-377.

Lientz, B.P., & Rea, K. P. (1995). San Diego, Academic. Project management for the 21st century.

Loch, C.H., DeMeyer, A., & Pich, M. (2011). Managing the unknown: A new approach to managing high uncertainty and risk in projects.John Wiley & Sons.

Love, P.E., Sing, C.P., Wang, X., Irani, Z., & Thwala, D.W. (2014). Overruns in transportation infrastructure projects. Structure and Infrastructure Engineering, 10(2), 141-159.

McCoy, F. (1996). Measuring success: Establishing and maintaining a baseline. s.l., PMI Annual Seminar/Symposium, Montreal.

Memon, A. H., Abdul Rahman, I., & Aziz, A.A.A. (2011). Time overrun in construction projects from the perspective of project management consultant (PMC). Journal of Surveying, Construction and Property, 2(1).

Merrow, E.W. (2011). Industrial Megaprojects: Concepts, Strategies, and Practices for Success John Wiley & Sons. Inc., Hoboken, New Jersey.

Naimi, M., Elhag, T., & Fenn, P. (2008). Delay and its consequences in construction of Iranian petrochemical plants.In International Conference on Multi-National Construction Projects.

Memon, A.H., Rahman, I.A., &Azis, A.A.A. (2011). Preliminary study on causative factors leading to construction cost overrun. International Journal of Sustainable Construction Engineering and Technology, 2(1).

Motaleb, O., & Kishk, M. (2010). An investigation into causes and effects of construction delays in UAE. In Procs 26th Annual ARCOM Conference (pp. 6-8).

Odeh, A. M., & Battaineh, H. T. (2002). Causes of construction delays: Traditional contracts. International Journal of Project Management 20,67-73.

Olaniran, O. J., Love, P. E., Edwards, D., Olatunji, O. A., & Matthews, J. (2015). Cost overruns in hydrocarbon megaprojects: A critical review and implications for research. Project Management Journal, 46(6), 126-138.

Oyegoke, A. S., & Kiyumi, N. A. (2017). The causes, impacts and mitigations of delay in megaprojects in the Sultanate of Oman. Journal of Financial Management of Property and Construction, 22(3), 286-302.

Pham, L. H., & Hadikusumo, H. (2014). Schedule Delays in engineering, procurement , and construction petrochemical projects in Vietnam: a qualitative research study. International Journal of energy sector management, 8(1), 3-26..

Rui, Z., Peng, F., Ling, K., Chang, H., Chen, G., & Zhou, X. (2017). Investigation into the performance of oil and gas projects. Journal of natural gas science and engineering, 38, 12-20.

Ruqaishi, M., & Bashir, H. A. (2015). Causes of delay in construction projects in the oil and gas industry in the gulf cooperation council countries: a case study. Journal of Management in Engineering, 31(3), 05014017.

Salama, M., El Hamid, M. A., & Keogh, B. (2008, September). Investigating the causes of delay within oil and gas projects in the UAE. In 24th annual ARCOM conference (pp. 1-3).

Sambasivan, M., & Soon, Y. W. (2007). Causes and effects of delays in Malaysian construction industry. International Journal of project management, 25(5), 517-526.

Vafaiee, M., Owlia, M. S., Vahdat, M. A., & Vafaiee, M. (2010, January). Procurement management challenges in gas projects of Iran. In Proc. of the 10th International Conference on Industrial Engineering and Operations Management (pp. 9-10).

Zadjali, Z. A. A., Bashir, H. A., & Maqrashi, A. A. (2014). Factors Causing Project Cost Overrun in the Telecommunications Industry in Oman. International Journal of Information Technology Project Management, 5(3), 84-95.